Add this copy of Programmed Introduction Critical Path Pergamon to cart. $18.28, good condition, Sold by M Godding Books Ltd rated 5.0 out of 5 stars, ships from Devizes, WILTS, UNITED KINGDOM, published 1967 by Pergamon Press.
Choose your shipping method in Checkout. Costs may vary based on destination.
Seller's Description:
Good. Size: 14 to 17 cm tall (16mo); By Cambridge Consultants (Training) Limited, 1967. Previous owner's ink inscription. 58 pages plus glossry. Posted within 1 working day. 1st class tracked post to the UK, Airmail tracked worldwide. Robust recyclable packaging.