Written by a career construction professional, this text about scheduling and project control addresses the average student, detailing all the steps clearly and without shortcuts. And now, for the first time, the book is part of a learning package that comes with access to an online course built around the book provided by online training leader Red Vector. Solved and unsolved exercises cover all subjects and computer software programs for construction are included for each chapter. The book, and by extension the class, ...
Read More
Written by a career construction professional, this text about scheduling and project control addresses the average student, detailing all the steps clearly and without shortcuts. And now, for the first time, the book is part of a learning package that comes with access to an online course built around the book provided by online training leader Red Vector. Solved and unsolved exercises cover all subjects and computer software programs for construction are included for each chapter. The book, and by extension the class, presents precedence networks as the realistic solution to scheduling, the main part of project control, and introduces new concepts in CPM scheduling such as the author's own Dynamic Minimum Lag technique. The new edition includes coverage of building image modeling (BIM), lean construction, sustainability, and other cutting edge construction topics.
Read Less
Add this copy of Construction Project Scheduling and Control: Red Vector to cart. $400.99, new condition, Sold by Just one more Chapter rated 3.0 out of 5 stars, ships from Miramar, FL, UNITED STATES, published 2015 by Wiley.