Aging U.S. Air Force fleets have deterioration problems, resulting in increased maintenance workloads. Programmed depot maintenance (PDM) is significant, requiring 2,000 to 50,000 labor hours and material. RAND developed the PDM Capacity Assessment Tool (PDMCAT), applied it to the KC-135 PDM process, with three alternative forecasts of future workload and two fleet-size scenarios, to inform aircraft availability and resource allocation decisions.
Read More
Aging U.S. Air Force fleets have deterioration problems, resulting in increased maintenance workloads. Programmed depot maintenance (PDM) is significant, requiring 2,000 to 50,000 labor hours and material. RAND developed the PDM Capacity Assessment Tool (PDMCAT), applied it to the KC-135 PDM process, with three alternative forecasts of future workload and two fleet-size scenarios, to inform aircraft availability and resource allocation decisions.
Read Less
Add this copy of Programmed Depot Maintenance Capacity Assessment Tool-: to cart. $7.51, very good condition, Sold by Bookmonger.Ltd rated 5.0 out of 5 stars, ships from Hillside, NJ, UNITED STATES, published 2007 by RAND Corporation.
Add this copy of Programmed Depot Maintenance Capacity Assessment Tool: to cart. $36.44, good condition, Sold by Bonita rated 4.0 out of 5 stars, ships from Santa Clarita, CA, UNITED STATES, published 2007 by RAND Corporation.